API 5CT N80 Aman tib

Deskripsyon kout:

Dyamèt ekstèn
4 1/2″, 5″, 5 1/2″, 6 5/8″, 7″, 7 5/8″, 9 5/8″, 10 3/4″, 13 3/8″, 16″ , 18 5/8″, 20″, 30″
Epesè miray la
5.21 - 16.13 mm


Pwodwi detay

Tags pwodwi

Espesifikasyon API 5CT L80

Kalite fil
SC (fil wonn kout), LC (fil wonn long), BC (fil kontrè), lòt fil prim
Longè

longè

Pwojè

R1

R2

R3

Tib

6.10-7.32m

8.53-9.75m

11.58-12.80m

Anvlòp

4.88-7.62m

7.62-10.36m

10.36-14.63m

API 5CT N80 konpozisyon chimik

Estanda

Klas

Konpozisyon(%)

C

Si

Mn

P

S

Cr

Ni

Cu

Mo

V

AI

API SPEC 5CT
 

J55K55

0.34~0.39

0.20~
0.35

1.25~1.50

≤0.020

≤0.03

≤0.15

≤0.20

≤0.20

 

 

≤0.020

(37Mn5)

N80

0.34~0.38

0.20~
0.35

1.45~1.70

≤0.020

≤0.03

≤0.15

 

 

 

0.11
~0.16

≤0.020

(36Mn2V)

L80 (1)

≤0.43

≤0.45

≤1.9

≤0.03

≤0.03

 

≤0.25

≤0.35

 

 

 

L80(9Cr)

≤0.15

≤1.00

0.3~0.60

≤0.020

≤0.030

8~
10.0

≤0.50

≤0.25

0.9 ~ 1.1

 

≤0.020

L80(13Cr)

0.15~0.22

≤1.00

0.25~1.00

≤0.020

≤0.030

12.0~
14.0

≤0.50

≤0.25

 

 

≤0.020

P110

0.26~0.35

0.17~
0.37

0.40~0.70

≤0.020

≤0.030

0.80~
1.10

≤0.20

≤0.20

0.15
~0.25

≤0.08

≤0.020

(30CrMo)

API 5CT N80 Pwopriyete mekanik

Estanda

Klas

Fòs rupture (MPa)

Sede fòs (MPa)

elongasyon (%)

Dite

API SPEC 5CT

J55

≥517

379~552

0.5%

≤241HB

K55

≥655

379 ~ 552

0.5%

N80

≥689

552 ~ 758

0.5%

L80(13Cr)

≥655

552 ~ 655

0.5%

P110

≥862

758 ~ 965

0.6%

API 5CT N80 Casing Tubing Steel kòd koulè

Non

J55 K55 N80-1 N80-Q L80-1 P110
Anvlòp yon bann vèt klere de bann vèt klere yon bann wouj klere yon bann wouj klere + yon bann vèt yon bann wouj + yon bann mawon yon bann blan klere
Couplage tout kouple vèt + yon bann blan tout kouple vèt tout kouple wouj tout kouple wouj + yon bann vèt tout kouple wouj + yon bann mawon tout kouple blan

API 5CT N80 Espesifikasyon Kalite fen-fini

Etikèt Dyamèt deyò T&C Epesè miray la Kalite fen-fini
(d/mm) (kg/m) (t/mm)
1 2       J55/K55 M65 L80/R95 N80-1/Q C90/T95 P110 Q125
2/1/2004 9.5 114.3 14.14 5.21 PS PS - - - - -
10.5 114.3 15.63 5.69 PSB PSB - - - - -
11.6 114.3 17.26 6.35 PSLB PLB PLB PLB PLB PLB -
13.5 114.3 20.09 7.37 - PLB PLB PLB PLB PLB -
15.1 114.3 22.47 8.56 - - - - - PLB PLB
5 11.5 127 17.11 5.59 PS PS - - - - -
13 127 19.35 6.43 PSLB PSLB - - - - -
15 127 22.32 7.52 PSLB PLB SLB PLB PLB PLB  
18 127 26.79 9.19 - PLB SLB PLB PLB PLB PLB
21.4 127 31.85 11.1 - PLB PLB PLB PLB PLB PLB
23.2 127 34.53 12.14 - - PLB PLB PLB PLB PLB
24.1 127 35.87 12.7 - - PLB PLB PLB PLB PLB
2/1/2005 14 139.7 20.83 6.2 PS PS - - - - -
15.5 139.7 23.07 6.98 PSLB PSLB - - - - -
17 139.7 25.3 7.72 PSLB PLB PLB PLB PLB PLB -
20 139.7 29.76 9.17 - PLB PLB PLB PLB PLB -
23 139.7 34.23 10.54 - PLB PLB PLB PLB PLB PLB
26.8 139.7 39.88 12.7 - - - - P - -
29.7 139.7 44.2 14.27 - - - - P - -
32.6 139.7 48.52 15.88 - - - - P - -
35.3 139.7 52.53 17.45 - - - - P - -
38 139.7 56.55 19.05 - - - - P - -
40.5 139.7 60.27 20.62 - - - - P - -
43.1 139.7 64.14 22.22 - - - - P - -
2006/5/8 20 168.28 29.76 7.32 PSLB PSLB - - - - -
24 168.28 35.72 8.94 PSLB PLB PLB PLB PLB PLB -
28 168.28 41.67 10.59 - PLB PLB PLB PLB PLB -
32 168.28 47.62 12.06 - - PLB PLB PLB PLB PLB
7 17 177.8 25.3 5.87 - - - - - - -
20 177.8 29.76 6.91 PS PS - - - - -
23 177.8 34.23 8.05 PSLB PLB PLB PLB PLB - -
26 177.8 38.69 9.19 - PLB PLB PLB PLB PLB -
29 177.8 43.16 10.36 - PLB PLB PLB PLB PLB -
32 177.8 47.62 11.51 - PLB PLB PLB PLB PLB -
35 177.8 52.09 12.65 - - PLB PLB PLB PLB PLB
38 177.8 56.55 13.72 - - PLB PLB PLB PLB PLB
42.7 177.8 63.55 15.88 - - - - P - -
46.4 177.8 69.05 17.45 - - - - P - -
50.1 177.8 74.56 19.05 - - - - P - -
53.6 177.8 79.77 20.62 - - - - P - -
57.1 177.8 84,98 22.22 - - - - P - -
2007/5/8 24 193.68 35.72 7.62 - - - -   - -
26.4 193.68 39.29 8.33 PSLB PSLB PLB PLB PLB - -
29.7 193.68 44.2 9.52 - PLB PLB PLB PLB PLB -
33.7 193.68 50.15 10.92 - PLB PLB PLB PLB PLB -
39 193.68 58.04 12.7 - - PLB PLB PLB PLB PLB
42.8 193.68 63.69 14.27 - - PLB PLB PLB PLB PLB
45.3 193.68 67.42 15.11 - - PLB PLB PLB PLB PLB
47.1 193.68 70.09 15.88 - - PLB PLB PLB PLB PLB
51.2 193.68 76.2 17.45 - - - - P - -
55.3 193.68 82.3 19.05 - - - - P - -
2007/3/4 46.1 196.85 68.61 15.11 - - P P P P P
2008/5/8 24 219.08 35.72 6.71 PS PS - - - - -
28 219.08 41.67 7.72   PS - - - - -
32 219.08 47.62 8.94 PSLB PSLB - - - - -
36 219.08 53.58 10.16 PSLB PSLB PLB PLB PLB PLB -
40 219.08 59.53 11.43 - PLB PLB PLB PLB PLB -
44 219.08 65.48 12.7 - - PLB PLB PLB PLB -
49 219.08 72.92 14.15 - - PLB PLB PLB PLB PLB
2009/5/8 32.3 244.48 48.07 7.92 - - - - - - -
36 244.48 53.58 8.94 PSLB PSLB - - - - -
40 244.48 59.53 10.03 PSLB PSLB PLB PLB PLB - -
43.5 244.48 64.74 11.05 - PLB PLB PLB PLB PLB -
47 244.48 69.95 11.99 - PLB PLB PLB PLB PLB PLB
53.5 244.48 79.62 13.84 - - PLB PLB PLB PLB PLB
58.4 244.48 86.91 15.11 - - PLB PLB PLB PLB PLB
59.4 244.48 88.4 15.47 - - - - P - -
64.9 244.48 96.58 17.07 - - - - P - -
70.3 244.48 104.62 18.64 - - - - P - -
75.6 244.48 112.51 20.24 - - - - P - -
2010/3/4 32.75 273.05 48.74 7.09 - - - - - - -
40.5 273.05 60.27 8.89 PSB PSB - - - - -
45.5 273.05 67.71 10.16 PSB PSB - - - - -
51 273.05 75.9 11.43 PSB PSB PSB PSB PSB PSB -
55.5 273.05 82.6 12.57 - PSB PSB PSB PSB PSB -
60.7 273.05 90.33 13.84 - - - - PSB PSB PSB
65.7 273.05 97.77 15.11 - - - - PSB PSB PSB
73.2 273.05 108.94 17.07 - - - - P - -
79.2 273.05 117.87 18.64 - - - - P - -
85.3 273.05 126.94 20.24 - - - - P - -
2011/3/4 42 298.45 62.5 8.46 - - - - - - -
47 298.45 69.95 9.53 PSB PSB - - - - -
54 298.45 80.36 11.05 PSB PSB - - - - -
60 298.45 89.29 12.42 PSB PSB PSB PSB PSB PSB PSB
65 298.45 96.73 13.56 - - P P P P P
71 298.45 105.66 14.78 - - P P P P P
2013/3/8 48 339,72 71.43 8.38 - - - - - - -
54.5 339,72 81.11 9.65 PSB PSB - - - - -
61 339,72 90.78 10.92 PSB PSB - - - - -
68 339,72 101.2 12.19 PSB PSB PSB PSB PSB PSB -
72 339,72 107.15 13.06 - - PSB PSB PSB PSB PSB
16 65 406.4 96.73 9.53 - - - - - - -
75 406.4 111.62 11.13 PSB PSB - - - - -
84 406.4 125.01 12.57 PSB PSB - - - - -
109 406.4 162.21 16.66 P - P P - P P
2018/5/8 87.5 473.08 130.22 11.05 PSB PSB - - - - -
20 94 508 139.89 11.13 PSLB PSLB - - - - -
106.5 508 158.49 12.7 PSLB PSLB - - - - -
133 508 197.93 16.13 PSLB - - - - - -

Detay pwodwi

N80-STEEL-PIPE
casing-tubing-production-line

  • Previous:
  • Pwochen:

  • Ekri mesaj ou a isit la epi voye li ba nou